Companies / GPU cloud and data-centre operator
IREN
Reviewed measures, kept in their reported scope. Company-wide revenue is not automatically AI-specific revenue.
Power and delivery
Data-centre pipeline>5,000 MW
Company describes a pipeline greater than 5GW; lower bound shown, not live IT load.
2026 IT-load delivery target300 MW
Targeted cumulative delivery, not current billing capacity.
Separate disclosed measures · stages can overlap and are not additive · FY26 / August 2026 update
Source: IREN disclosure ↗. Figures are manually curated in the repository ledger and are not refreshed automatically with new earnings.